Meter Pole Requirements

Their use is intended to promote a safe, efficient manner for receiving electrical service. LSI Industries cannot accept responsibility for harm or damage caused in these situations. Scheduling and performance of corrective action. The Taps & Meters (Water/Waste Water)Department is responsible for managing wastewater flows through wastewatercapacity reservations (WCR), managing water demands through water/storm drainage commitment letters, review process which provides information on water, wastewater and storm drainage requirements for new. For a house mount flagpole we recommend a 2. All requirements are based on PUD policies and standards as well as national, state and local electrical codes. The cast meter socket has a built-in grounding means connecting the neutral conductor to the socket base. 17 ; Temporary Service, p. 9 Meter <38 m3 1. illustrations rev-6 october 2011 page 2 of 44. Entrance cable to Mobile Home 8' Min. In accordance with FCC regulation, Duquesne Light Company (DLC) permits telecommunications and cable companies to place attachments on its poles, duct and/or conduit. 1% accuracy class, LCD readout in hundredths of a kWh, to 99999. The voltage that will best serve you depends on the maximum load to be served, the location of the load, the number of metering points, your future power requirements, the nature of your load, and your rate schedule. (Additional items such as special attachment requirements, grounding requirements, climbing devices, hot line maintenance requirements. (f) Delivery schedule and free on board (FOB) destination, and owners’ contact. It is important that the Customer and their engineer or contractor obtain and refer to the Specifications for Electrical Installations book (ESB #750) in conjunction with this supplement for these installations. Communication between the CGRs and the head end system is cellular. I'm installing a new power pole with a 200 amp panel for my mobile home. Requirements. Remove the 1-1/4" knockout at the bottom of the meter base. Different voltages may change requirements. 92(B), including bonding to the grounded conductor of the service. 000 S ranges 2) at sample temperature. Power poles are partially buried 6 to 10 feet below the ground. ( Author: kreed Created Date. There are self-contained meters. pole furnished by consumer service attachment, service wire, and connectors to be furnished and installed by cooperative consumer to leave a minimum of 18" of conductor extending from weatherhead ground bill of material item qty description 1 1 4"x 6" (minimum) timber or 6" diameter (minimum. If you do not have the ability to drive, you do not meet the new criteria for a meter-exempt parking placard and will be issued a blue, non meter-exempt parking placard. 5 Electrical 1. Application is assessed and a charge may apply. Scheduling and performance of corrective action. Pole Meters. CITY OF LOS ANGELES DEPARTMENT OF WATER AND POWER. These meter mains utilize designs that meet EUSERC requirements. For underground electric and gas installations for new homes in the PECO service area, please consult the Builder's Handbook to understand the general process for working with PECO to complete your project. 2 Ramp Meter Signal Standard (Type 1 Ramp Meter Pole) 45 4. • The driveway must not obstruct access or cause damage to public utilities such as bus stops, bikeways, parking bays, taxi ranks, stormwater drains, water meters, fire hydrants, utility service pits, street trees and power or light poles. Also you have to remember that the meter is property of the utility company, not the homeowner or city. The disconnect device shall be. However, poles can reach heights of 120 ft (37 m) or more to satisfy clearance requirements. (METER POLE OR HOUSE SERVICE. ' C9114 Title and Application note revised to add distribution automation (DA) comm requirements for vaults; vault added on Exhibit A sketch. Twinlead has long been obsoleted. In this artic­le, we will learn a little bit about the history of pole vaulting, and then we will explore the. Electric meters are devices installed by utility companies to measure electricity consumption. For safety reasons, the pole is to be kept free of all obstructions such as antennas, basketball goals, etc. Bell Lumber & Pole’s excellent reputation has been built on a long history of supplying quality wood poles to the standards and specifications of utility companies throughout North America. Either an eyebolt or a J-hook is acceptable and must be within the top 6 inches of the pole (12 feet above ground). Transmissions poles are also treated with tanalith C and are mostly used in the Northern African countries. Valmont ® Structures is one of the world’s leading providers of infrastructure solutions. Requirements for Service. Download The Bowie-Cass Mobile App. if pole is to be used as rv pole then rv plug may pole service and rv pole service. Recreonics offers over 3,500 swimming pool products online Use this dynamic order feature that allows you to quickly place your order with us. 7 The Electric Service Guide in general is for PNM Service Territories. Marshall County REMC Rebates; Power Moves Rebates; Power Shift Progam; Safety. Meter Installation from Pad-Mount Transformer w/ VT Pack 480V Figure 15. 6-1 — Underground Service Conduit System Installation Specifications. The electric meter measures the amount of electricity that is used by your home or business, which tracks it by a rate of kilowatts per hour as is the electric companies billing unit of measurement. 200 AMP Overhead Meter Pole Installation. 03 METER BYPASS REQUIREMENTS 1000. Spacing requirements for Communication Worker Safe ty Zone are specified by the NESC. This means crews may need to dig around the pole and perform below ground inspections. 5 REQUIREMENTS FOR SERVICE CONNECTION. 4"x6" timbers are not acceptable, even for temporary or construction power poles. Those meter installations at multiple occupancy buildings where the individual meters for various customers are arranged in a bank or grouping in the same area, and are energized from the same service entrance. Multiple Meters The NEC generally requires a building or structure to be supplied by only one service. Sometimes there isn’t enough to make ends meet. 6 meters) above or below a point of access. Meters on poles for communication companies may be transferred to new poles as necessary. 01 Purpose Most customers wishing to establish new electric service with NorthWestern Energy will find that the information provided in NorthWestern Energy Company’s New Service Guide adequately describes the details and requirements for establishing a new electric service. Spacing requirements for Communication Worker Safe ty Zone are specified by the NESC. Electric Rule 15 and Electric Rule 16 for a park that qualifies as a mobile home development as defined by PG&E. Temporary Meter Pole Specs. The fi rst thing to think about is whether you would like an external meter box or not. You cannot receive a refund if you have placed a ShippingPass-eligible order. the bottom of the pole roof. In Arkansas, call 1-800-482-8998. Electric Specifications. Figure 2 and 3 – Pole, support and overhead connection requirements. WPS SERVICE MANUAL Revised 06/2018 Section 2 200 AMP AND SMALLER - COMMON Page 1 of 17 Section 2 - 200 Amp and Smaller - Common 2-0 General Metering Requirements. 5 feet above the ground. Registration of Entity 14 1. To measure light levels accurately requires the use of a light-level meter. sufficient height at pole and at member's premises to meet ground clearance requirements as required in NEC 225. Its purpose is to assist electrical contractors, engineers, architects, and manufacturers engaged in the installation of electrical service wiring and equipment. The member will furnish and set a meter pole. Specifications for Residential Overhead Meter Pole Requirements Items marked with are indicated on the following drawings: Drawing No. METERS FOR NON-RESIDENTIAL BUILDINGS A Meter Release can be approved during the final inspection phase of a project OR prior to final inspection, which is called a “pre-final meter. Application (or Agreement for Service or Contract): The agreement between the Company. Bureau of Standards (now NIST) developed the theory behind this test in 1915 (see reference pg. the Companyfor interior meter room locations. Additional poles and wires necessary for service on private property are paid for by the customer, but installed and owned by the Company. Spacing requirements for Communication Worker Safe ty Zone are specified by the NESC. I have service in Long Island or The Rockaways, NY. Power tapped from these poles is first passed through the electric meter so that consumption is measured accurately. When power is needed for residential building construction, NEMEPA will connect single phase 120/240 volt temporary service. 92(B), including bonding to the grounded conductor of the service. The hours of enforcement for parking meters outside of the above premium demand zones will continue to be 7 am to 6:30 pm. These specifications and supplements are a guide for the design and construction of electrical installations. Other Drawings. pole(s) to verify that they meet the requirements stated within this note (Note 7). Pole to be set 4 feet deep in ground and have 12 feet clearance at the top of pole. Always call before you dig. Options There are many different types of housing that can be used for sheep. 3 Overhead Ramp Meter Signal Standard (Type 2 Ramp Meter Pole) 45 4. 9 kHz in 400. Overhead Service to a Meter Loop Pole Revised May 1, 2000. 10/24/2019 Upper Hoh Scheduled Outage A power outage that was originally scheduled for Thursday, October 24, is now scheduled for Thursday, October 31, 2019 beginning at 8:00 a. 9-A Miscellaneous Equipment 52. meter pole 200 amp service, 120/240 vac. Mobile homes must use a permanently installed meter pole located not more than 30 feet from the mobile home that it serves. Generally the poles, columns and masts supplied by GPA are either base plate mounted (circular, octagonal or polygonal on a steel flange, or directly buried into the ground if under 15 m in height. 5 out of 5 stars 25. All the work will be done from this source, once work is complete the temporary pole will have power disconnected and. cra-es reserves the right to determine all meter locations, including points of attachment, and only authorized cra-es personnel shall determine this location. Sales and delivery are limited to locations inside Sumter EMC's service territory in Georgia. There is also a minimum top circumference that is the same for all species and lengths. All unmetered conductor compartments may be sealed by the utility company. Call today for a free temporary power pole estimate. Electric Service Requirements Page i INTRODUCTION The information in this Electric Service Requirements book is intended to provide electrical contractors, architects, engineers, building contractors, and other customers with the information needed to determine the acceptable methods of receiving electrical service from Chugach Electric. the Companyfor interior meter room locations. The average height of a telephone pole is 45 feet, which is class 3 and commonly used for distribution. Pole should be 6 inch in diameter. Service entrance cable from meter pole to member's premises shall be of sufficient ampacity and type rated for outdoor use and supported on a suitable messenger. Physical stamina. The fi rst thing to think about is whether you would like an external meter box or not. information & requirements for electric service customers electricians architects engineers builders inspectors i n f o r m a t i o n & r e q u i r e m e n t s f o r e l e c t r i c s e r v. CREDIT REGULATIONS 2. 6 meters) above or below a point of access. A meter will be installed on the outside wall of a building, on a meter stub, or on a meter pole. If you want to move your meter further, you need to contact your gas network operator. Sales and delivery are limited to locations inside Sumter EMC's service territory in Georgia. New / Altered Meters The information contained in this manual is intended to provide electrical contractors, architects, building contractors, engineers, and other customers with the specific technical information needed for determining acceptable methods of receiving electrical service from the PUD. General Design Policy. Meter bases are provided by the Customer/Contractor and shall be electrical grade, steel, UL listed and stickered, NEMA 3R, and have a maximum rating of 320 amps (residential)/200amps (commercial). 1 fc to 25 fc. The pole must be at least four feet in the ground. The information and recommendations in our Meter and Service Guide (PDF) are, in general, sufficient to answer questions concerning a majority of electrical installations. All Ontario-specific amendments included in the 27 th Ontario Electrical Safety Code can be found here on ESA’s website. Be sure to tamp the pole solidly in the ground. Trees for You. Pole Must be 20' Long, Treated, & Minimum 6" Round Diameter Pole. Multi-gang meter sockets - manufacturers and specifications for multi-gang socket and breaker combinations. and lasting… 10/22/2019 Water Restrictions & Drought Response Alerts Lifted for Clallam Bay/Sekiu and Island View Water Systems. NRTL – Nationally Recognized Testing Laboratories. information & requirements for electric service customers electricians architects engineers builders inspectors i n f o r m a t i o n & r e q u i r e m e n t s f o r e l e c t r i c s e r v. Amazon's Choice for 200 amp meter pole. Meter Installation. This 50-amp service has 4 wires with two 120-volt HOT feeds. Please refer to the "Revisions" section in this document for more detail on the changes. 5 feet below ground level at an approved location by a Sam Houston Electric Cooperative inspector. Most private power poles across Queensland are reaching the end of their serviceable lifespan after 30-50 years and are subject to structural issues due to weather, termites, rot and corrosion. You never quite know when the band will open and where it will take you. Electrical code requirements for location of power meter panel. Whether you are applying for service, needing an additional meter, requesting a yard light or need to notify us about someone in your family who is on life support we have made the process easy and quick to fit into your busy schedule. Please see the following documents for information on customer-owned:. These requirements are an overview of the District’s Service Policies and of the Washington State Electrical Codes, and are not intended to replace or supplant such codes or policies, but only to give the customer a basic knowledge of the requirements for service connection. Download These Specification Documents. The water meter box cannot be located in sidewalk or driveway paving. Install, Upgrade or Relocate a Service The following forms are for installing new services (you need new lines and poles), upgrading an existing service or relocating a service. Weatherproof pole mounted meter boxes are pre-wired electricity boxes having a robust and weatherproof design to fulfil the requirements of the National code of practice at the customer interface (4th edition 2008). It is important that the Customer and their engineer or contractor obtain and refer to the Specifications for Electrical Installations book (ESB #750) in conjunction with this supplement for these installations. 9 Meter <38 m3 1. 9 million utility customers in Arkansas, Louisiana, Mississippi and Texas. Guying of the meter pole may also be required for. A customer, who is not entitled to such a road clearance pole, may have a pole installed on the customer's private property, on a full cost basis for such pole installation. Important: • Adequate work-pit size • Depth • Clearance. Off-set Meter Constuction These Siemens Meter Load Center Combinations feature an offset meter to increase room for pulling conductors. Your assigned Xcel Energy representative will work with you to find a meter location that will fit your project needs. We have untreated, treated, and PG&E approved poles in stock. 5 – Single-Phase Underground Meter Pole Requirements. We provide a large variety of standard sizes from 16″ to 90″ high and from 25″ to 42″ deep with adjustable and reversible EIA 19″/23″ racking rails, front and rear doors and 3 point, pad locking handles. Pole length determined by service drop clearance requirements. btutilities. 9-A Miscellaneous Equipment 52. Meter pole size where applicable, will be determined by a Cooperative Representative. DDB Unlimited is an OEM NEMA Outdoor Enclosure Manufacturer. TABLE OF CONTENTS iii ELECTRIC SERVICE HANDBOOK/SINGLE‐FAMILY RESIDENTIAL PROJECTS Manufactured homes 29 Meter base/socket installation requirements for manufactured homes 30. Our products are proudly built in our modern facility using quality components from leading suppliers like Eaton/Cutler Hammer, Madison, Topaz, Halex and Milbank. radius size 100 – 225a 2 1/2" 24". Track and Field/Cross Country Call for Proposals. 5 mm captive screw connectors. It is important that your new meter is installed in a safe, maintained, and easily accessible location. The EASZ-1 oil/water monitor is a highly accurate online analyzer that is installed in a pipe and can be used as a bs&w monitor or a water cut meter. space, etc. Ground Rod & Clamp Ground Wire Main Breaker Panel Galvanized Pipe Nipple Meter Socket Furnished by CAEC Waterproof Connector Service Entrance Cable Weatherhead--Recommended but. Service meter location and main breaker size in amps. Meter Base Specifications Standard Meter Loop Specifications - Permanent Residence Standard Meter Pole Specifications - Mobile Home or Temporary Service. Remote Temporary Meter Pole DS-4-5. Communication between the CGRs and the head end system is cellular. Contains service information, employment opportunities and related links. Vault suppliers, please review our detailed vault requirements for underground distribution systems. Sales and delivery are limited to locations inside Sumter EMC's service territory in Georgia. Meter Poles Wired meter poles and meter pedestals are available for purchase from Sumter EMC for installations requiring a meter pole or meter pedestal. By taking some of the following into consideration, one can safely wire electricity to a newly built pole barn or garage. Please see the following documents for information on customer-owned:. Meter Boxes UK. Attach another length of #4 ground wire to the ground rod using a ground clamp. If conditions exist that necessitate the placement of concrete before inspection the inspector must be able to see both sides of the footer and be able to determine the thickness of the footer. 8/8/2019: 12. Get OG&E’s Meter Standards here or in the Resources section of this page. Pole setting depth is generally 2 feet plus 10% of pole length. pole furnished by consumer service attachment, service wire, and connectors to be furnished and installed by cooperative consumer to leave a minimum of 18" of conductor extending from weatherhead ground bill of material item qty description 1 1 4"x 6" (minimum) timber or 6" diameter (minimum. Posts should be placed 1m (3’-4”) from each side line, 36’-8” from each other. Customers will be able to monitor their energy use and figure out ways to save money on their bill. Meters and Related Specifications. must be weatherproof type. We have untreated, treated, and PG&E approved poles in stock. Schedule 40 or greater, electrical grade PVC, and the service riser to the meter socket shall include an expansion cou-pling that allows for 8" fall. DDB Unlimited is an OEM NEMA Outdoor Enclosure Manufacturer. 200 AMP Overhead Meter Pole Installation. ANHORING Meter poles over 75 feet from the ooperative pole must have an anchor assembly. A 360-degree white all-around masthead light with two-mile visibility normally fulfills this requirement for most pleasure boats, but familiarize yourself with and follow the rule. (Pole vault landing area diagrams courtesy of the NFHS; all other diagrams courtesy of the ASBA. 5 out of 5 stars 25. Meter Pole Requirements for Central Al. OSHA has set regulations on minimum light requirements in workplaces to ensure the safety of those working in areas where a certain amount of light is required to do the job safely and effectively. 00* (2 hour minimum) for each subsequent trip by a Line Crew. Calibration is a comparison between the reading of a device and that of a standard. Temporary pole location is to be not more than 5' See chart for wire size requirements. Article 422. ” Final inspection meter release process. Only persons with an Illinois driver's license AND one of the qualifying disabilities are eligible for a meter-exempt disability parking placard. Relocate an existing Pole or Line. then a back guy on the mast or meter pole is required. Available in sizes 3 m to 12 meter octagonal , conical hot dip galvanized poles, and 12. Also you have to remember that the meter is property of the utility company, not the homeowner or city. Meter Specification Sheet. GENERAL NOTES: Meter sockets shall be furnished and installed by customer in accordance with Gulf Power and Florida Meter Group requirements (See GENERAL REQUIREMENTS FOR SERVICES LESS THAN 600 VOLTS, Section C, "Meter Sockets", on page 12). In some circumstances you will need to get an electricity pole or an overhead electricity line moved. 2 Meter Installation for Self-contained, 3-phase Meter D732. 5x4' flag on a 5' flag pole, or a 3x5' on a 6' pole. Those meter installations at multiple occupancy buildings where the individual meters for various customers are arranged in a bank or grouping in the same area, and are energized from the same service entrance. 05 LOAD CENTERS 1000. Call OKIE at 811 or 1-800-522-OKIE. You can use this form to request an inspection of an Ausgrid power pole. DRAWINGS G-1. Northern California Pole Sales, Inc. Standard lengths are 5, 10 and 20 feet. Most private power poles across Queensland are reaching the end of their serviceable lifespan after 30-50 years and are subject to structural issues due to weather, termites, rot and corrosion. Meter pedestals - manufacturers and specifications. CONSTRUCTION STANDARDS. The City of El Paso, International Bridges Department manages the over 1,700 on-street parking meters city-wide. Statement of Purpose 1 II. ♦ Multiple meter bases must be installed so that the highest meter is no more than 6'-6". 7 -Meter Pole Guying In the event the customer requires larger than a 200 Amp service, this will require a current. There is also a minimum top circumference that is the same for all species and lengths. Cooperative to supply meter and meter base. Minimum pole length is 18 feet overall with 4 feet set in the ground. Home; Inspecting Poles in the 21st Century. WATER CUT METER EASZ-1 LOOP POWERED WATERCUT METER. 1 Location 45 4. The Simplified 2 meter J-Pole By Michael Martens, KB9VBR Many a new ham’s first antenna has been the 2 meter J-Pole. Leave approximately two inches of the ground rod exposed. Upon notification of a completed and approved meter loop, the Cooperative will connect service and install a meter. Section 6: Spacing of Light Poles Anchor: #i1004657 Standard Spacing for Freeways and Complete Interchange Lighting. In locations with underground facilities, the Customer shall notify One Call and shall have One Call locate all underground facilities before digging. FORM 3-70-NEP-Revised 7-03 SOUTH CENTRAL POWER COMPANY Minimum Requirements: TEMPORARY METER POLE INSTALLATION - Overhead Single phase, 120/240 Volts, 3 wire service, 60 Amp. the bottom of the pole roof. This publication is a guide to the BGE’s requirements and does not cover all the rules and. It is responsible for ensuring accuracy in the selling of measured goods, developing and enforcing the laws related to measurement accuracy, approving and inspecting measuring devices and investigating complaints of suspected inaccurate measurement. A Licensee’s Attachments must be installed on the same side of poles (typically the road side) as the existing Attachers. Flagpole Lighting Law and Requirements. After you have collected all of the information, please call our office at 800-287-8564 to speak to a Member Services Representative. It's like having the Cooperative Web Site and Member Services Department in the palm of your hand! Available for both Android and IPhone Smart Phones, the "Bowie-Cass" mobile app is designed to give you fast and secure account access. meter loop installation guide deep east texas electric cooperative, inc. The 100 amp RV Pedestal with Meter Compartment shown below (Cat# RVMPED), is equipped with 50, 30 and 20 amp receptacles and circuit breakers. Entergy is a Fortune 500 company headquartered in New Orleans. The recommended beach volleyball court dimensions for Recreational play is 60’ by 30’. 5-1 Shaft: 5-1-a 7,10 meter height galvanized steel shaft octagonal cross section and tapered from bottom to top, and made of one piece. Remember, we do not have requirements on the specifications of the pole used. These meter mains utilize designs that meet EUSERC requirements. Meter bases must have a provision to accept an OUC lock or seal. We are proud to be a Midwest energy company that provides electric and natural gas services to our customers and communities throughout Iowa and Wisconsin. The wind and sun of Kittitas County are a tremendous natural resource for producing clean, renewable energy. My meter box is on a pole 10ft from the overhead power. Variations of this design may be considered equal as long as NEC requirements are met. Cooperative supplied meter base must be used. Electric cooperatives were born because investor owned utilities did not think it profitable to run many miles of power lines for few customers in the rural areas. org was established in 2008 by two manufacturing engineers who worked in the automotive and lighting industries. Meter Can and Cabinet C. Attachments to both sides of the pole (boxing) are not permissible. Determined inquiring minds can consult OSHA’s revised Walking Working Surfaces ruling for general industry, but this can be a laborious process. Notes and Requirements Pole *NOTE: Reference Diagram labeled Pole & Meter Base on page 2. 2 Area meets high jump and pole vault increments: Starting height will be two inches lower than the lowest qualifiers mark in the high jump and six inches lower in the pole vault. Safety Precautions; Storm Center; Programs & Services. Meter combos are ideal for rural applications, out buildings and other situations where service disconnects are located outside due to local codes and preferences. How to Pull an Electric Meter. i already have a Temp pole with power run to it I want to run a line to the mobile home which will be about 50ft away. 0 Page: iv Revision Date: May 1, 2016 Effective Date: August 1, 2016 CPS Energy Pole Attachment Standards Table of Contents Section Page I. METER PAN INFORMATION. from a Co-op pole. from meter base to panel main lugs. A round preservative treated pole 16 ft. Requirements for Service. get with your local electrician and he can shed alot on the issue. Basically, you build the pole to the utilities specifications, and follow NEC while you do it. RA2, December 2012. ELECTRIC SERVICE REQUIREMENTS. The Wire Size can range from 16 AWG to 12 AWG. • Meter pole size where applicable, will be determined by a Cooperative Representative. Meter breakers are most often sold in the western, southwest-ern and southeastern United States. LSI Industries cannot accept responsibility for harm or damage caused in these situations. See Figures 1,9,12. INSPECTION REQUIREMENTS. Temporary Underground Meter Pole Specs. Attach hub to the panel and screw the nipple tightly into the hub. net and click on "Information for Contractors". The information and recommendations in our Meter and Service Guide (PDF) are, in general, sufficient to answer questions concerning a majority of electrical installations. com Getting Down to Earth 7 Dr. 480V Delta or 277/480V Wye, 200 Amp & Below Service, Self-Contained Metering with Meter Disconnect Figure 16. While the National Electric Code (NEC) has not specified a minimum, ideal and maximum height for electrical meter boxes, the utility company does. Established in 1946, TEC's Pole Manufacturing Plant is headquartered in Jasper County, deep in the East Texas Piney Woods. Pilings are also defined by the installation. 451(e)(1) Direct access is acceptable when the scaffold is not more than 14 inches (36 centimeters) horizontally and not more than 24 inches (61centimeters). Track Area Placements for 2019. The Taps & Meters (Water/Waste Water)Department is responsible for managing wastewater flows through wastewatercapacity reservations (WCR), managing water demands through water/storm drainage commitment letters, review process which provides information on water, wastewater and storm drainage requirements for new. Light poles should not be installed in urban median areas less than 30 feet wide if any other design is practical. If you need to set up new service or a meter inspection, you can call a new construction representative at 405-619-6500 or 1-800-380-4643. You can use this handy cost per square meter calculator to make sure you always have the information you need exactly when you need it, all with a couple clicks of your mouse. Even if the existing PV inverter is paid for, a power factor of 1. Your assigned Xcel Energy representative will work with you to find a meter location that will fit your project needs. 20) without requiring passage through restricted private areas, gates or fences. 1-3 — Meter Pole (Single-phase Underground Load Connection) Installation Specifications. Electric service requirements. About SWR; My OSJ 146/440 J-Pole went through 3 hurricanes in 6 weeks, with gusts speeds, on occasion, as high as 153 MPH. A wood backing is not allowed on the meter pole. Additional poles and wires necessary for service on private property are paid for by the customer, but installed and owned by the Company. the pole mounted panel (main disconnect) and my indoor panel ?. Requirements. Siemens QN2200R 200-Amp 2 Pole 240-Volt Circuit Breaker. There is a formula that takes into consideration the light fall-off from that lamp, the angle that the lamp illuminates and the acceptable lighting level at the edge of the lamp's illumination area. Multi-gang meter sockets - manufacturers and specifications for multi-gang socket and breaker combinations. on utility poles from attachments and weather conditions (e. The information and recommendations in our Meter and Service Guide (PDF) are, in general, sufficient to. marked on meter enclosure, pole, or durable material attached to pole and should be visible from street. NESC requirements for grade "B" construction for. Those meter installations at multiple occupancy buildings where the individual meters for various customers are arranged in a bank or grouping in the same area, and are energized from the same service entrance. Ground wire to be stapled to the pole and sized schedule 80 PVC grey conduit with U. See Figures 1,9,12. Whether you are applying for service, needing an additional meter, requesting a yard light or need to notify us about someone in your family who is on life support we have made the process easy and quick to fit into your busy schedule. A meter will be installed on the outside wall of a building, on a meter stub, or on a meter pole. Meter Enclosure – A device which houses a Meter Socket and line and load terminals. Pole Service Life - An Analysis of Country Energy Data - Produced by Koppers and Country Energy using the asset database for the whole network along with inspection data to give expected service lives for different pole types.